Qingdao Beauty Products Supporting Industrial Park

100% renewable energy power supply, zero carbon emissions, AI energy dispatching system, zero-carbon source demonstration project with 3-month rapid deployment

Qingdao Beauty Products Supporting Industrial Park
Completion Date: 2025-03-15 Project Location: Qingdao, Shandong

Project Overview

The total investment of the project is 150 million yuan, covering an area of 45,672 square meters, mainly including 5 production workshops, office buildings, water treatment rooms, etc. It has built one production line with an annual output of 456t/a of eyelash raw materials (including 120t/a of domestic eyelash raw materials, 206t/a of high-imitation eyelash raw materials, and 130t/a of high-quality eyelash raw materials), and 4 production lines with an annual output of 4t/a of glue (including 1.26t/a of non-drying glue, 1.12t/a of self-adhesive strips, 1.07t/a of polyimide special glue, and 1.15t/a of high-temperature resistant waterproof adhesive strips).

Project Challenges and Solutions

100% Renewable Energy Power Supply Requirement.

Challenge: The client requires the energy center to use completely renewable energy to solve the intermittency and volatility issues of energy supply.
Solution: A hybrid energy system is adopted, integrating 3.5MW photovoltaic power generation, 1.5MW wind power generation, and 2.5MWh energy storage system, combined with an AI energy dispatching system to achieve dynamic balance between energy supply and demand.

Rapid Delivery Requirement

Challenge: The client requires the main structure construction to be completed within 60 days, which cannot be met by traditional construction methods.
Solution: Adopting full modular prefabrication technology, 85% of the components are processed in the factory, and on-site assembly construction is carried out, shortening the construction period by 50% compared with traditional processes.

Green Energy Efficiency Standards

Challenge: The energy system needs to achieve 24-hour intelligent management and remote monitoring to ensure the stability of energy supply.
Solution: Develop an AI energy dispatching system that predicts energy demand and supply through machine learning algorithms, automatically adjusts energy distribution, and maximizes energy efficiency.

Technical Highlights

  • Hybrid Energy System: Integrating solar energy, wind energy, and energy storage technologies to achieve all-weather renewable energy power supply.
  • AI Energy Dispatching: Machine learning-based energy management system that predicts energy demand and supply and optimizes energy distribution.
  • Modular Steel Structure: 95% factory prefabrication with on-site rapid assembly, significantly shortening the construction period.
  • Intelligent Monitoring System: Real-time monitoring of energy production, consumption, and equipment status to ensure safe and stable operation of the system.
  • Zero Carbon Emission Design: Whole-life cycle carbon emission accounting and control to achieve zero carbon emissions during the operation phase.

Project Achievements and Benefits

Quantitative Achievements

Carbon Emission Reduction 100%
Construction Period Shortened 60%
Energy Cost Reduction 45%

Economic Benefits

  • Initial investment saved by 18%, approximately 8.6 million yuan
  • Annual operating costs reduced by 20%, approximately 1.2 million yuan
  • Annual power generation revenue of photovoltaic system is 1.5 million yuan, with an investment payback period of 6 years
  • Put into operation 6 months in advance, increasing revenue by 24 million yuan

Consult the Same Scheme

Want to know how to apply large-span steel structures and photovoltaic technology to your project? Our expert team is ready to provide you with customized solutions.

Project Technical Parameters

  • Building Area 86,000㎡
  • Maximum Span 36 meters
  • Structure Form Steel truss + rigid frame composite structure
  • Steel Usage 5,800 tons
  • Seismic Fortification 8 degrees (0.2g)
  • Photovoltaic Installation 1.2MW
  • Construction Period 60 days

Project Honors

  • 2024 Annual Steel Structure Gold Award

    Issued by China Steel Structure Association

  • Green Building Two-star Certification

    Issued by Ministry of Housing and Urban-Rural Development

  • Shandong Provincial Prefabricated Building Demonstration Project

    Issued by Shandong Provincial Department of Housing and Urban-Rural Development